Tuesday, June 4, 2019

Swing Bridge General Earlier Bridge

oscillate tie General Earlier BridgeThe river Esk has been crossed for centuries and it has been keep by Edward III in 1353, and has been repaired with hard wood from the Oak by John Sehlboty in 1407.In 1926 Riding justices decided that the couple should be change to bleakfound structure twosome with portable parts. 96 years later the link was in very impoverished condition and was indigenceed to be repaired, See paradigm 1earlier pair whitby.png flesh 1 Earlier bascule keep goingFirst thrill Bridge.The yoke was built in 1835 until 1908. The drop part was make from wood and the opening was by manned winches to allow the ships to pass through. After years opening system has been changed by water-driven opening engine. The problem was that the link up slip bys edge pass to the ships by 13.72 meters, See chassis 2.scscsc.bmpFigure 2 scratch line slash straddleSwing Bridge.The existing Swing Bridge was built by and by the First Swing Bridge by a year in 1909 its th e third crossing yoke over the river Esk within the Habour zona of heart of Whitby. The twain just turned 100 in 8th of August 2009. During 1966 to 1970, were 25 accidents recorded on 76.2 meters keen-sighted. In addition the duo has to open approximately every(prenominal) half an hour to let the ships passing through and this ca expenditures delay to some(prenominal)(prenominal) concern and pedestrians around 5 minutes.The bridge carries (A171) that comes from Meddilsborough to Scarborough. Its one Way Bridge for commerce and two counsels for large number of pedestrians, the bridge has insufficient dimensions regards to the traffic and pedestrians nowadays, its 4.2672 meters carriageway commodious and footpath width of 1.05 meter. Through by the high season the footpath it allow be exceedingly packed and the people have to step out into the carriageway due to the restriction of footpath wideness without paying attention of oncoming vehicles. dismantle though sometimes the traffic indecisive to cross the bridge against other cars. As gentle as the when two big vehicles crossing a large the bridge one of them has to mount on to the paving to let the other vehicle pass through, see Figure 3.exesting swing bridge.pngFigure 3 existing swing bridgeCurrent condition of the bridge.The bridge has age of 100 years old and its over the expected age, at present time the Swing Bridge has annually forethought of 60,000. The main maintenance was carried in 1985 with cost of 400,000. The major refurbishment was carried due to the bad condition as followingThe superstructure was seriously corroded. sorry state of operating machines and its placed with electrically hydraulic system.At present time the bridge causes problems due to its position which is blotto to the North Sea. The surface social class of the paint being de-bonded, the flakes fallen into the river damaging the flora and fauna of marina. Moreover, the chloride is extremely high and causes seri ous wearing to the vane plate of the bridge. natural bridge.Movable Bridge.This display case of bridge that moves in order to allows the ships and boats and so on to pass through. This end is economical because it reduces the cost of construction and this nookie be achieved by planting it on the ground, evading the disbursals of high sorrels and the long approaches. whence this generates the ease of passages for the ships and reducing the constructions expense.Movable bridges is operating by different methods such as electrical motors like skying and hydraulic pistons etc. these bridges also cause traffic delay because the traffic has to be stop to let the sea traffic to pass. Basically, there are 13 figures of movable bridges and the common types are Swing Bridge and Bascule Bridge.Types of bridges.NameDescriptionDesigndrawbridge.The bridge ornament is flexible jointd on one end.Drawbridge..jpgFigure 4 DrawbridgeBascule bridge.A drawbridge hinged on pins with a count erpose to facilitate raising.bascule bridge.jpgFigure 5 Bascule bridgeFolding bridge.A drawbridge with multiple sections that collapse unneurotic naiantly.Folding bridge.jpgFigure 6 Folding BridgeCurling bridge.A drawbridge with multiple sections that curl vertically.Curling bridge.jpgFigure 7 Curling bridgeLift bridge.The bridge deck is lifted up by counterweighted cables mounted on towers.Lift bridge.jpgFigure 8 Lift bridgeTable bridge.A lift bridge with the lifting mechanism mounted underneath it.Table bridge.jpgFigure 9 Table bridgeRetractable bridge (Thrust bridge).The bridge deck is abjure to one side.Retractable bridge.jpgFigure 10 Retractable bridge (Thrust bridge)Rolling bridge.An unhinged drawbridge which is lifted by the rolling of a large gear segment along a horizontal rack.Figure 11 Rolling bridgeSubmersible bridge.The bridge deck is lowered batch into the water.Submersible bridge 4.jpgFigure 12 Submersible bridgeTilt bridge.The bridge deck, which is curved, is lift ed up at an angle.Tilt bridge.jpgFigure 13 Tilt bridgeSwing bridge.The bridge deck rotates around a fixed point, usually at the centre, but may resemble a gate in its operation.Swing bridge.jpgFigure 14 swing bridgeTransport bridge.A structure high above carries a suspended, ferry-like structure.Transporter bridge 1.jpgFigure 15 Transport bridgeJet bridge.A passenger bridge to an airplane. One end is mobile with height, yaw, and tilt adjustments on the outboard end.AdelaidJetBridgeS7386.jpgFigure 16 Jet bridgeBascule Bridge.Bascule connect are the most popular of opening bridges, the main part of bascule bridges is the counterweight, which is designed to be overhead counterweight or counterweight below the deck as shown in figure 17 and 18. Counterweight is continuously balance the leaf (span)This kind of bridge is to balance the bridges that rotate about the horizontal axis at right angle to its longitudinal centerline. Bascule severely implements to these kind that consist of a s ingle pitiable element, which turns about the horizontal line close to its centre of gravity in order that the weight on one side that rotate on an axis mostly balance the weight on the other side, however the balance usually non precise.The movement of the bascule bridge mostly is up and down, when it moves keeping the bridge closed, its called as span heavy, or if its moving to keep the bridge to open its called counterweight heavy. Bascule Bridge can possibly be a single or double leaf that moves up and down to allow sea traffic to pass through..29.pngFigure 17 single bascule bridge with overhead counterweightFigure 18 single bascule bridge with counterweight below the deck laneDouble leaf Bascule Bridge.It comprises of two leaves pointed opposite each other and connected together at their ends where they attach over the seafaring channel as shown in figure19. The distinction between the single and double is the double leaf has advantages as followingIts higher above the water aim with the same span.Rapidly openingLarge navigation headway while its closed. succeed less wind resistance.Require small counterweight.Require small machinery.The injustice is that the double bascule bridge requires two times as much of every part.Untitled.pngFigure 19 Double bascule bridge with counterweight below the deck roadMany types of bascule bridges have many failures, where as the Rolling lift type Scherzer type invention solved these problems with distinct advantagesAs it rotates it pulls itself out of the way of navigation.Provide more clearance to ships compared with other types from the same class.It does not have to open at wider angel as the other type of bridges to give a clear way for the ships.Rolling bascule Lift Bridge has one disadvantage such as it does not pivot about a hinge point, instead utilizing a rack and pinion mechanism to maintain the support and alignment.Figure 20 Fixed-trunnion Bascule designFigure 21 Rolling BasculeThe common type of design is called Chicago Bascule this structure of it is much better than the others where it is a fixed-trunnion bascule design, the bridge pivoted around a large axel when trunnion slopes upward, see figures 20, 21 and 22.rackpinion.gifFigure 22 tie-up and Pinion mechanismsThe difference between Double-leaf Bascule Bridge and Swing Bridge.Double leaf bascule bridge with overhead counterweightAdvantagesDisadvantagesIt workings as a cantilever for both dead/ red-hot load and its simply supported for live load.Overhead-counterweight is exposed to vandalism and perhaps blocks aspect of view.The mechanisms can be avoided from the bad weathering and risks of vandalism by place them underneath the road deck.2. The power required from the machinery to move the span is proportional to the max wind speed over large area of deck.Provide great opening and shut compared with swing beiges.Provide clearance to small boasts without fully opening.Swing bridgeAdvantagesDisadvantagesThe power required f rom machinery to move the span is not great as for bascule bridgeIts required more time for opening and closing compared with Bascule Bridge.The machinery is under the deck but part of them dipped into the water.Long pier required to protect the span and this block the scene of the view.Does not require building cofferdam for piers and foundation construction and protection.The old Bascule Bridge of Whtiby.The earlier bridge was Bascule Bridge constructed before the existing swing bridge in the heart of Whitby. The bridge was manually operated before replacing it by hydraulic operated swing bridge. Therefore, proposing to build pertly modern bascule bridge can bring back Whitbys historical heritage and remember the local people to their history.Improving or Replacing the Swing Bridge.General.As a result from the current condition of the swing bridge must be maintained by 60,000 annually. On the other hand aft(prenominal) few years it might to be subscribe to maintenance with high cost. Therefore to construct reinvigorated bridge with good specifications wont be maintained at least for the first decades. Basically its suitable to construct new bridge that might cost around 350,000 thousand instead of using it for maintenance on the current swing bridge. The new design pull up stakes avoid all the environmental effects, high cost of maintenance, and traffic congestion within the bridge and greatly reduce the risk exposed to pedestrians.Therefore, it is highly recommended that the Whitby should have a new bridge rather than spending money on providing maintenance to the swing bridge.The Viable Solution.The viable solution, whichever to improve or replace the Swing Bridge has been decided to replace it with new bascule bridge in the same fix. The new bascule bridge lead be used just by pedestrians and freight cars due to the area surrounding the current swing bridge it go away be pedestrianized indicate to New Development.As for the traffic, new bascule b ridge pull up stakes be constructed in the upper Harbour zone from New Quay Road to perform Street gondola car Park, refer to New Crossing. It will be used by traffic and pedestrians in order to reduce the traffic congestion and danger/risk word picture to pedestrians.The good advantages of this viable solution areThe new bascule bridge between the Church Street and New Quay Road will be constructed first and use the current Swing bridge as temporary bridge in order to reduce the cost of the construction.When construction is finished the current swing bridge will be replace with new bascule bridge which is just for pedestrians, and bring back old memories of first bascule bridge.When the construction of new pedestrians Bascule Bridge will be finished, so the tourist and local in peak season they will be at ease to walk along the bridge without any congestion, no fright from traffic and enjoy the scene of the Harbour zone centre.Proposed military position of new bridge.General .The locations are important to verify the reason of chosen bridge type, as well as proposing locations are useful to choose the appropriate position for the bridge. The location should be reasonable to match with other locations and suggestion of New Developments. Therefore, it should be easy to rile and satisfy the users.All locations that will be proposed must not ruin other places andNew Quay road to Church Street via Bridge Street.This plan shows where the new pedestrians bascule bridge will be constructed which is in the same location of current swing bridge. When the new bascule bridge will be used by pedestrians the narrow road on both side will sufficient for them and enjoy the scene the Harbour zone, there wont be any equalisation required, no affect to ships owners and their parks and the old swing bridge can be placed in museum as memorial, as shown in figures 23 and 24.Figure 23 new pedestrians Bascu7le BridgeUntitled.jpgFigure 24 new pedestrians Bascule BridgeNew Qu ay Road to Church Street.New bascule bridge for traffic and pedestrians, Refer to New crossing.Deck design of new pedestrians Bascule Bridge.The deck design of the bridge will be formulated to fit the maximum possible amount of pedestrians without any risk. In order to comply with the safety of the pedestrians the dimensions as the followingThe comprehensive width of the deck is 6m.The total length of the deck will be the same as the total length of the bridge which is 43m as shown in figure 25.The boilers suit thickness of the deck from the centre is 200mm and it descends to 190mm to both side ends of the bridge. This inclination counted for the drainage system. cover slab thickness is 0.15 meter.Historical brick thickness 0.05 meter. See figure 26.Handrails will be in the same dimensions for both sides. The recommended bodily that can be used for the Handrails is aluminum alloy which is can resist the corrosion from chloride spread from the air.Street lights will be installed on the bridge to enjoy the view during iniquity time.The deck pavement will be brick covering the layer of the cover to match with surrounding building and protect the history of the town. As well as for the piers.The material that will be used for the deck is composite concrete, this type will be used because it takes time to reach the certain rigidity in order to steel deck can serve as bracing for all horizontal forces.The beams that will be used to carry the load of the deck are I-beams the design contains two beams parallel to each other along the length of the deck.The outmatch steel beams type can be used that can resist the corrosion is galvanized steels beams and also can be painted to prevent it from revealing to chloride attack.Figure 25. Front elevationFigure 26. Section of deck and pierGeneral surmise calculation for the pedestrians bascule bridge attached with next sheet.New crossingProposed location of new bridgeGeneralThe locations are important to verify reason o f chosen bridge, as well as proposing locations are useful to choose the appropriate position for the bridge. The location should be reasonable to match with other locations. Therefore, it should easy to access, comfortable size and satisfy the users.From the viable solution of swing bridge that will be pedestrianized and the area around. So new crossing must be provide to solve the matter of traffic, its have been decided that new bascule bridge will be constructed for both traffic and pedestrians as a part of the viable solution. The best location of the bridge has been decided to be build between New Quay road and Church Street.New Quay Road to Church StreetThis proposal illustrates the location of the bascule bridge that will be constructed almost parallel to the swing bridge. This location has good advantages due to non narrow road, there is no demolishing required eject on the river banks where the bridge is connected to the both sides. Having look at to the site, on the side of New Quay Road the pedestrians pathway has adequate space can be widen in order to construct the two lane new bascule bridge, in the other side the traffic and pedestrians can easily get access to Church Street throughout car park, the main advantages of these two sides areIts easy to construct.No demolishing required to any houses, historical building or shops.Wont affect any boats, ships parkingWont have any objection from locals, or vessel owners.Figure shown traffic from New Quay Road to Church StreetDeck design of new traffic and pedestrians Bascule Bridge.The deck will be designed for pedestrian and traffic, this design should accommodate both of them without having any traffic congestion and avoid pedestrian from risk. Therefore, the design must comply for both of them. The dimensions will be as following13 meters overall width.4 meters wide for each lane.2.5 meters wide for pedestrians pathway for each side.0.29 meter total thickness from the center of the deck sloping do wn to 0.28 meter to the ends parallel to pathways. This allows water to throw sideways to drainage system.Concrete slab thickness is 0.15 meters.deuce layers of tar thickness are 0.12 meters.0.02 meter bitumen thickness will be covering the concrete deck.Handrails will be designThe Handrails design will be on both sides to prevent pedestrians to step out on the road. Therefore, the hazard will be greatly reduced for pedestrians. The perfect design of Handrails should comply with the decrease of risk. So the design of handrails on the side next to the road will be 500mm height concrete barrier and 500mm handrails above the concrete.As for the material used, composite concrete will be used in the deck because before the concrete reaches certain rigidity, steel deck is needed to serve as bracing for all horizontal forces.The best of handrails material its recommended to use galvanized steel handrails.The assumption calculation procedure for the new crossing is the same as new pedestri ans bridge but the structural dimension will be different depending on the load because it has different material such as Asphalt, bitumen and concrete etcAbutment for both bascule bridges.The abutment is the structure that conveys the load from deck to the pile cap. Thus, the size of the abutment is 3m-3m on the top part, and 2-2 on the lower part, as shown in figureCofferdam Construction for both bascule bridges.Before construction the foundation, essentially required a cofferdam to be constructed to prevent the water from entree into foundation construction area. Sheet of steel plates that are joined together is commonly used type due to ease of insight and pull out of the ground.Therefore after construction of the cofferdam the water need to be pumped out.Construction of counterweight for both bascule bridges.The counterweight duty is to balance the closing and opening of the bridge which are called counterweight heavy and heavy span or held on position , the design of counter weight usually 1.5 1.7 times of the overall weight of the deck. Its recommended to choose 1.6 to provide appropriate counterweight for opening and closing.The recommended type of counterweight mechanism is roulette wheel and pinion rather than using hydraulic pistons system. The Rack and pinion is more economic and easy to maintain comparing with hydraulic pistons system.Calculation of counterweight weight of Pedestrians Bridge.Total load of the deck - 1.6 = 0Therefore 1856 - 1.6 = 297 KN.Calculation of counterweight weight of traffic and pedestrians Bascule Bridge will be the same as above.Foundations and geology for both bascule bridgesIn accordance with boreholes data, the following boreholes 22, 26 and 113 around the area of Swing bridge location are representing different characteristics.The information of borehole 22 shows the followingThe depth from the surface up to 4.90 meters, the blot consists of make ground.Starting from 4.90 meters down to 15.00 meters deep, the fou lness composed of alluvium.The made ground and alluvium soil layers contains of coarse gravel, Sandy silty, Sandy clay, Alluvium soil, these types of soils have different spatial relation and properties such as the unit weight, void ratio, low shear strength and high ability to be compacted/condensed.The information of Borehole 113 illustrates the following.Starting from surface down to 2.45 meters deep, the soil composed of alluvium.From 2.45 meters down to 12.20 meters deep, the soil is mainly sand and gravel.From 12.20 meters, countdown to depth of 3.80 meters, the soil made up of alluvium.Starting from 3.80 meters depth layer of alluvium to depth of 16.85 meters, the soil consists of sandstone and glacial.The information of borehole 26 has the same characteristics, properties and condition of borehole 22 and 113.Footing.Based on the soil condition and the deck load the appropriate recommended size of footing of the pedestrians bascule bridge dimensions will be 3m - 3m width an d length.PilesRecommended type that can be used is steel tubular stacks.SpecificationSteel tubular pile (rounded piles).Closed-ended, this manner that the toe of the pile is welded with a piece of steel plate, and poured into it with concrete in order to strike the concrete with hummer.Stiffeners can be installed within the piles to embroider buckling and bending resistance.The propose from using this type because it has common use in marina structure nowadays.Therefore the number of piles to be constructed for pedestrians Bascule Bridge as followingFour piles for each pier.The diameter of each pile is 400mm.As for the new crossing bridgeThe footing size and number of piles to be constructed will be different than the pedestrians bridge because the new crossing has two lanes, different deck dimensions and two piers next to each other as shown in figure..Method statementIntroductionThis method statement illustrates how all activities or special duties will be carried out. It show s the possible hazard connected with specific works and how to control it, in order to manage the work safely.Scope of worksThis document act toward with the constructions of three bridges over the river Esk of Whitby. The first bridge is new bascule bridge for pedestrians will be located in the same location of the existing Swing bridge, second bridge is the another new bascule bridge for both traffic and pedestrians will be located on the upper Harbour zone, and the third is to construct new Arch bridge will be situated in the same place of the high level bridge.Health and safety welfare and facilitiesImpermanent welfare facilities will be provided by the contractor or sub-contractor which will be accepted by the both. Welfare facilities should satisfy all staff which will include canteens, toilets etc. capable qualified personnel and a suitable number of first aid kits should be available during work period. All staff must undergo implement working rules, wearing ad hominem pro tective equipment that will protect them against all different risks such as safety jackets, helmets, gloves, eye protection, shoes and good quality clothes that can distinctly seen etc.General Approach.The construction preparation of the three new bridges will engage activities on the site for new development. The construction of the bridges will be in sensitive places which are important connection between two sides of Whitby in the centre of the Harbour zone. The majority of people and traffic need to move along to get on the other side and its significant especially in the peak season for tourists to enjoy the scene of the Harbour zone and traffic crossing Whitby coming from Tess to Scarborough. Therefore, the construction should be finished in short time. Hence the work duration for both bascule bridges will be as followingWeekdays, 700 1900.Weekends, 900 1300.Irregular works at night if its required.As for the new Arch bridge will be two shits per day as followingFirst shif tWeekdays, 700 1400.second shift, 1400 2100Weekends.Saturday will be at the same time as weekdays.Sunday, one shift from 700 to 1400.Prefabrication of bridge will be carried out off-site if needed.Construction activities on the new two Bascule Bridges will include.Site set up, including offices, services and facilities. Container offices are the economics and fast to build or remove.container_staircase_construction_office_02.jpgFigure 25 Containers officesConstruction of piles support abutments of the bridge for both leafs.yourfile.jpground-pile-caps.jpgFigure 26 Steel tubular piles Figure 27 pile capsConstruction of footing and piers for the bridge.Namibia_Caprivi_ZambeziBridge_Construction-Pier_1.jpgFigure 28 bridge piersConstruction of jury-rigged fencing and entry provide, provisional noise and dust reduction devices around the site compounds.gates.jpguntitled.JPGFigure 29 Entry gates Figure 30 fencesbnb.jpgccccc.jpgFigure 31 Permenant niose reduction Figure 32 Dust reductio n devicesConstruction of impermanent environmental defense works, along with stormwater centering and cars, vans, heavy machineries and trucks wheel washer.5369_ss100_Round2.JPGwheelwashbig2.jpgFigure 33 environmental protections Figure 34 Wheel washersConstruction of cofferdams, the appropriate types for rivers is sheet piles due to its their ability of penetration to many different types of ground, water tightness given by its interlocking sections.cc.bmpFigure 35 CofferdamsProvide special machineries for river bed cleaning, and disposal all the folderol to unauthorized areas or use it for filling.untitledb.bmpclean.jpgFigure 36 Excavator for river cleaning Figure 37 clam shale for river cleaningProvide pile drive machinery for piles installations.pile-driver-image1.gifFigure 38 Pile drive machinesConstructions of temporary structures and footing demanded for the launch of the bridge for both sides if required. Activity includes preparation of hardstand areas for crane access an d a long steel structure for the fabrications and set up of the bridge.Setting up and testing of establishing equipments.Proper lights should be installed in right places that will be used during night works.trip_kashaf.jpgFigure 39 site lightsProvide appropriate cranes that can carry all parts of the bridge and arrange locations for standing whether if it on either sides or using barge crane.crane_page4.jpgBargeCrane.jpgFigure 40 heavy crane Figure 41river heavy craneInstallation of security guards to separate the site construction from live roads such as NJ-barriers or fences or others.P145-01.jpguntitled.bmpFigure 42 NJ-barriers Figure 43 conesSite survey of the area designed for the passage and location of the cranes to be having a part in the setting of the bridge.Rearrangement or construction of protection works of existing services probably to be affected by the setting operations.Removing the Swing Bridge.Set up the method to remove it with any damages to the swing bridge.Pr ovide cranes for uplift each span whether from sides of the bridge or by barge carne.Demolishing the foundation and recycled if its in proper condition or use it for land filling.All staff must have an acquaintance about removing heavy structure to ensure that the bridge will be in the same condition after removing.Provide trucks or ships that can carry the weight of each span.Clean/wash the spans and all parts from any impurities that can affect the environment.Construction works during weekends for the launching of the bridges.Working together with button company staff respecting power failure and other safety routines.Formal approval that the lanes, paths, roads surrounding area of launching to be closed for the weekends and first night for people safety and avoid any vandalism actions.Installation of floodlights and other possibility measures determined by the risk analysis.Setting operation.Installation of the bridge on its permanent bearing.Construction time period.The durat ion of the project depends on the obtainability of tracks to accomplish the removing and construction of the bridge.Removing of Swing Bridge depends on the plan, equipments and labours. Construction of foundation and piers can be fulfilled in normal times.The construction of the bridge will be divided into different stagesStage 1Consists of construction of the pile installation, footing, piers, impermanent structure and prefabrication of the bridge and precast elements if it will be provided.Stage 2Launching of the new bascule bridge, which wont to take long time.Stage 3Two day plan to check bridge deck

No comments:

Post a Comment

Note: Only a member of this blog may post a comment.